Solar Terminology
Commercial Solar Glossary
Plain-language definitions of the terms commercial solar buyers encounter — from first inquiry through project completion.
A
- AC (Alternating Current)
- The type of electricity used by most commercial buildings and the utility grid. Solar panels produce DC electricity, which inverters convert to AC for use in your facility.
- AHJ (Authority Having Jurisdiction)
- The local government agency responsible for reviewing and approving building permits for solar installations. AHJ requirements vary by jurisdiction and affect permitting timelines.
- Array
- A group of solar panels connected together. A commercial solar system may consist of multiple arrays on different roof sections or ground-mount structures.
B
- Battery Storage / BESS
- A Battery Energy Storage System that stores electricity for later use. Commercial battery storage systems deliver demand charge reduction, solar self-consumption maximization, and backup power capability.
C
- Capacity Factor
- The ratio of actual energy output to the maximum possible output if the system operated at full capacity 24/7. Commercial solar systems typically have capacity factors of 15–25% depending on location.
D
- DC (Direct Current)
- The type of electricity produced by solar panels. Inverters convert DC to AC for use in commercial buildings and export to the utility grid.
- Degradation Rate
- The annual decline in solar panel output over time. Industry standard is approximately 0.5% per year. A system producing 100% in year 1 produces about 87% in year 25.
- Demand Charge
- A utility fee based on your peak power draw during a billing period, measured in kilowatts (kW). Demand charges can represent 30–50% of a commercial electricity bill and are a key driver of battery storage ROI.
E
- EPC (Engineering, Procurement, and Construction)
- A solar contractor that handles the full project lifecycle: engineering design, equipment procurement, and physical construction. Also called a solar installer or solar developer.
F
- Feed-in Tariff
- A utility program that pays solar system owners a fixed rate for all electricity generated, regardless of whether it is consumed on-site or exported to the grid. Less common in the US than net metering.
G
- Ground-Mount Solar
- A solar installation on a ground-level structure rather than a rooftop. Ground-mount systems are ideal for facilities with available land and can be oriented for optimal production.
I
- Interconnection
- The process of connecting a solar system to the utility grid. Requires utility approval and typically takes 60 days to 6+ months depending on the utility.
- Inverter
- A device that converts DC electricity from solar panels to AC electricity for use in buildings and export to the grid. Types include string inverters, microinverters, and power optimizers.
- ITC (Investment Tax Credit)
- A 30% federal tax credit for the cost of a commercial solar system, applied directly against federal income tax liability. One of the most powerful financial incentives for commercial solar buyers.
- IRR (Internal Rate of Return)
- A financial metric that measures the annualized return on a solar investment, accounting for the time value of money. Commercial solar projects typically deliver IRRs of 8–20% depending on market and incentives.
K
- kW (Kilowatt)
- A unit of power equal to 1,000 watts. Commercial solar system sizes are typically expressed in kW DC (panel capacity) or kW AC (inverter capacity).
- kWh (Kilowatt-hour)
- A unit of energy equal to one kilowatt of power used for one hour. Electricity bills are measured in kWh. Solar system production is expressed in annual kWh.
L
- LCOE (Levelized Cost of Energy)
- The average cost per kWh of electricity generated by a solar system over its useful life, accounting for all costs and production. Used to compare solar economics across different markets and system sizes.
M
- MACRS (Modified Accelerated Cost Recovery System)
- A federal tax depreciation method that allows commercial solar systems to be depreciated over 5 years rather than their 25–30 year useful life. Creates significant tax savings in years 1–6.
- Microinverter
- An inverter installed on each individual solar panel, converting DC to AC at the panel level. Microinverters improve performance in shaded conditions and typically carry 25-year warranties.
- MW (Megawatt)
- A unit of power equal to 1,000 kilowatts or 1,000,000 watts. Large commercial and utility-scale solar systems are measured in MW.
N
- NABCEP
- North American Board of Certified Energy Practitioners. NABCEP certification is the leading professional credential for solar installers and is a positive indicator of installer quality.
- NEM (Net Energy Metering)
- A utility billing arrangement that credits solar system owners for excess electricity exported to the grid. NEM policies vary significantly by utility and state, affecting the value of solar generation.
- NPV (Net Present Value)
- A financial metric that measures the total value of a solar investment in today's dollars, accounting for the time value of money. A positive NPV means the investment creates value.
P
- Payback Period
- The time required for energy savings and tax benefits to equal the net cost of a solar system. Commercial solar payback periods range from 4 to 12 years depending on market and incentives.
- Peak Sun Hours
- The number of hours per day when solar irradiance averages 1,000 W/m². Used to estimate solar system production. Phoenix averages 6.5 peak sun hours/day; Seattle averages 3.5.
- PPA (Power Purchase Agreement)
- A financing structure where a third-party developer installs and owns the solar system. The buyer purchases the electricity generated at a fixed rate below the utility rate. No upfront capital required.
- PV (Photovoltaic)
- The technology that converts sunlight directly into electricity using semiconductor materials. Commercial solar panels are photovoltaic devices.
R
- REAP (Rural Energy for America Program)
- A USDA grant program providing up to 50% of project cost for agricultural producers and rural small businesses installing renewable energy systems.
- REC (Renewable Energy Certificate)
- A tradeable certificate representing the environmental attributes of one megawatt-hour of renewable electricity generation. Some states (NJ, IL, MA) have REC programs that provide additional revenue for commercial solar systems.
- RFP (Request for Proposals)
- A structured competitive bidding process that solicits proposals from multiple qualified solar installers. A well-run RFP typically reduces project cost by 20–40% compared to single-source procurement.
- Rooftop Solar
- A solar installation mounted on an existing building roof. Ideal for facilities with large flat rooftops and limited available land.
S
- SREC (Solar Renewable Energy Certificate)
- A type of REC specific to solar generation. States like New Jersey and Massachusetts have SREC programs that provide additional revenue for commercial solar system owners.
- String Inverter
- An inverter that converts DC electricity from a string of solar panels to AC. String inverters are cost-effective but can be affected by shading on any panel in the string.
- System Size (DC vs. AC)
- Solar systems are sized in both DC (panel capacity) and AC (inverter capacity). The DC/AC ratio is typically 1.1–1.3, meaning a 1 MW DC system has approximately 800–900 kW AC of inverter capacity.
T
- Tilt Angle
- The angle at which solar panels are mounted relative to horizontal. Optimal tilt angle varies by latitude — typically equal to the site's latitude for fixed-tilt systems.
U
- Utility Interconnection Agreement
- A contract between a solar system owner and the utility governing the terms of grid connection, including metering, export compensation, and safety requirements.
W
- W (Watt)
- The basic unit of electrical power. Solar panel capacity is rated in watts (W) or kilowatts (kW). A 400W panel produces 400 watts of power under standard test conditions.